The super-wide beam is now moored in Cambridgeshire.
Sunday, October 30, 2011
Central heating
We are putting four radiators along the starboard side of the boat, plus a heated towel rail on the other side in the bathroom. The plastic pipes are clipped along the floor and will be joined to the radiators with copper pipe.
No comments:
Post a Comment