The super-wide beam is now moored in Cambridgeshire.
Tuesday, September 20, 2011
Prepping the wood
There are over 300 lengths of soild oak tongue and groove to be oiled and sorted. Two coats of finishing oil before they're installed makes everything easier. Luckily we've got quite a big shed.
No comments:
Post a Comment